2,118.06 zł tax incl.
Delivery time:
Available from stock or if not available delivery time is 4 weeks.
Pole tippler is designed for partial or total unloading of standard 120, 200-liter trolley or boxes E2.
Delivery time:
Available from stock or if not available delivery time is 4 weeks.
Security policy
Delivery terms
Return policy
Emptying of trolley to machines, devices, tables or containers occurss as a result of lifting it to 1600 mm and tilting. The device is controlled by a ‘pick up/put down’ button. When it is pushed, the operation stops, accordingly to safety rules, the container remains in previous position. Additional buffering crane allows precise dosing and extends the emptying time. The device is provided with flanges for solid fixing (WT341) and wheels (WT342). On customer's request there is a possibility to produce tippler with lower or higher level of discharge.
Pole tippler is designed for partial or total unloading of standard 120, 200-liter trolley or boxes E2.
Delivery time:
Available from stock or if not available delivery time is 4 weeks.
Delivery time:
Available from stock or if not available delivery time is 4 weeks.
Pole tippler is designed for partial or total unloading of standard 120, 200-liter trolley or boxes E2.
Delivery time:
Available from stock or if not available delivery time is 4 weeks.